TWO SOURCES (MSEDCL/RAW POWER TO DG POWER) AUTO CHANGE OVER SYSTEM

Abstract View PDF Download PDF

##plugins.themes.academic_pro.article.main##

Rinky Maity
Prem G. Thakare
Abhishek H. Bhosal
Ashish A. Jadhav

Abstract

The auto changeover system for two power sources, namely MSEDCL (Maharashtra State Electricity Distribution Company Limited) and raw power from a DG (Diesel Generator) is an innovative solution for seamless and reliable power supply management in situations where multiple power sources are available. This system automatically switches between MSEDCL power supply and DG power supply based on predefined criteria, such as voltage, frequency, and availability, ensuring uninterrupted power supply to critical loads

##plugins.themes.academic_pro.article.details##

How to Cite
[1]
Rinky Maity, Prem G. Thakare, Abhishek H. Bhosal, and Ashish A. Jadhav, “TWO SOURCES (MSEDCL/RAW POWER TO DG POWER) AUTO CHANGE OVER SYSTEM”, IEJRD - International Multidisciplinary Journal, vol. 8, no. 3, p. 4, Jun. 2023.

References

  1. MSEDCL (Maharashtra State Electricity Distribution Company Limited) Auto Changeover System:
  2. "Design and Implementation of Auto Changeover System for MSEDCL 33/11 kV Substation Using Programmable Logic Controller (PLC)" by A. R. Khan, V. B. Borghare, and P. M. Patil. International Journal of Emerging Technology and Advanced Engineering, Volume 3, Issue 11, November 2013. https://www.ijetae.com/files/Volume3Issue11/IJETAE_1113_75.pdf
  3. Raw Power to DG Power Auto Changeover System:
  4. "Design and Implementation of Automatic Power Changeover (APC) System for Raw Power to DG Power in Rural Areas" by R. S. Bagul, S. S. Kadam, and S. S. Kulkarni. International Journal of Research in Advent Technology, Volume 3, Issue 8, August 2015.
  5. http://www.ijrat.org/downloads/august-2015/IJRAT3AV3I8009.pdf